FILE NO. VMC/DWG/2024/NCR-001  ·  SECTION: GENERAL AWARENESS
NON-CONFORMANCE

UNCIVIL
ENGINEER

An interactive satire on infrastructure, bureaucracy, and engineering reality.

Research is 500 years ahead of practice.

Welcome to the gap.

M40 specified (IS 456:2000 Cl. 6.1).  M10 delivered.  Inquiry pending.

You are the engineer of record. Good luck.

RECORDS MAINTAINED SINCE APPROXIMATELY 1973. ACCURACY NOT GUARANTEED.

VIKASNAGAR — BY THE NUMBERS

SOURCE: VARIOUS. RELIABILITY: APPROXIMATE.

~62%

Bridges With Overdue Inspection

IS 456:2000 Cl. 15.1. 'Annual' does not mean what you think here.

~12%

DPR Traffic Surveys Done On Site

Remainder: Google Maps, 2019 screenshot, or 'estimated from experience.'

0.7

Engineers Per 1 Lakh Population

Sanctioned: 2.1. Filled: 0.7. Remaining 1.4: 'under recruitment since 2018.'

Rarely

Mill Certificates Verified At Site

IS 2062:2011 mandates traceability. Tracing leads to a very good printer.

200,000+

IS Codes In Existence

Approximately 30 updated. Annually. Retroactively.

~15%

Building Plans Matching Actual Construction

Approved: G+2. Built: G+5 with basement. Regularised: eventually.

IS 800:2007 on steel connections. IS 456 on concrete. IS 875 on loads. Site: 'noted'.IS 456:2000 Cl. 15.1 recommends periodic inspection. 'Periodic' = once, at commissioning, by the contractor.A DPR is a work of fiction with annexures.VALUE ENGINEERING: the technical term for 'we spent the budget on tender negotiations'The soil report was done for a different site. Literally.IS 3370 on water-retaining structures. The structure retains everything except water.NBC 2016 Part 4: fire exit width 1050mm minimum. Actual: 750mm. Through a kitchen.There are more codes than engineers who have read them.Tender eligibility criteria fitted to one firm is not competition. It is casting.The measurement book is an anthology of creative writing.IS 800:2007 on steel connections. IS 456 on concrete. IS 875 on loads. Site: 'noted'.IS 456:2000 Cl. 15.1 recommends periodic inspection. 'Periodic' = once, at commissioning, by the contractor.A DPR is a work of fiction with annexures.VALUE ENGINEERING: the technical term for 'we spent the budget on tender negotiations'The soil report was done for a different site. Literally.IS 3370 on water-retaining structures. The structure retains everything except water.NBC 2016 Part 4: fire exit width 1050mm minimum. Actual: 750mm. Through a kitchen.There are more codes than engineers who have read them.Tender eligibility criteria fitted to one firm is not competition. It is casting.The measurement book is an anthology of creative writing.